5. Inspections
Inland requires two inspections on each system warranted project. The
first inspection is conducted at the beginning of the project, after all
surface preparation is completed, and prior to the application of any
Inland products. Any necessary training issues will be conducted at
this time. The second inspection will be conducted at the end
of the project, after all product applications are completed.
Contractor shall provide the Inland Warranty Department at least two
(2) weeks notice for scheduling of on-site inspections.
Please refer to the Inspection Zone Chart to determine the appropriate
charge per inspection.
Inspection Zone Chart (pdf)
Inspection Zone Map
The Inspection Charges must be submitted to Inland, and the initial
inspection scheduled, before the start of the project to ensure that
the inspections can be performed at the appropriate times.
Inspection charges should be submitted to the following address:
Inland Coatings Corporation
Warranty Department
P.O. Box 247
26259 Hwy 6
Adel, IA 50003